4800 West 92nd Avenue Westminster, CO 80031


Community provides feedback on Westminster Station TOD plan

(May 03, 2012)

The first round of community outreach for the Westminster Station Transit Oriented Development (TOD) area planning process was held in March.

Outreach included two stakeholder meetings, a neighborhood open house and a neighborhood briefing with the Progressive HOA.

These meetings introduced the vision for the TOD area, the 135-acre area surrounding the future Westminster Station in South Westminster, with a conceptual urban design plan, potential land uses, circulation and station design and parks and open space.

A summary of the feedback provided by stakeholders and community members has been compiled and posted to the
TOD Plan website.

  |  Login