Westminster Boulevard Bridge over Big Dry Creek
The Westminster Boulevard Bridge over Big Dry Creek features decorative metal bridge railings in a repetitive arched pattern. Four large, tapered faux sandstone-clad pillars are located at the corners of the bridge. The city’s Big Dry Creek Trail passes under the bridge.
The bridge was designed by The Washington Group with architectural consultant Downing, Thorpe and James. Bridge construction was completed in 2002 and was funded by the City of Westminster.